Tuesday 17 February 2009

Bow buoyancy tank/seat finished!

The side seat face panels have been fitted in place with a thickened epoxy fillet along the bottom, the top has a strengthening strip to provide additional stiffness at this joint and give the seat top something to attach to. The bow seat-top has also been fitted, it should now be water/air tight (apart from the drain hole).

Wednesday 11 February 2009

Side bench panels cut out

The four ply panels that make up the side benches have been cut out and shaped. Below the side bench fronts are loosely held in position.

Tuesday 10 February 2009

Teak Veneer

Teak veneer has been stuck to the bow and then given a coat of epoxy to seal. Looks great.
Stern seat has been trimed to fit, suport for the seat has been fixed.