Tuesday 9 June 2009

Mast step

I have used a scrap piece of Iroko for the mast step and using a router cut the shape below to take the mast foot. There is also a hole to allow any traped water to drain.

Sunday 7 June 2009

Transom teak veneer and stb gunwale

Teak veneer has been added to the transom (to match the bow), transom and outboard pad then sealed with a coat of epoxy.

Starboard side inner and outer gunwale shaped and glued in place with epoxy.